Drop log · EDC Day 2026 · Guangzhou

SEKI at EDC Day 2026 — Booth B01

Scarab 5 — three years in the making, five sets left, decided by draw. Plus a white-copper Wave and a beetle collab.

BOOTH B01FINAL 5 · DRAWNEW WAVE
Fig. 01 — Show piece
SEKI — EDC Day 2026

← All drop records

Release record

Event EDC Day 2026 — Guangzhou Hard Core EDC Expo, LIC Hall
Booth B01 · EDC zone
Maker SEKI
Announced 圣甲虫5 Scarab 5 (last 5 sets by draw) · SEKI × NEK 玄·甲虫 · white-copper 波
Drop dates 1–2 August 2026, on the floor
Channel On-site at the booth; several drops use draws or registration
Status Announced — awaiting the floor
Source Organiser reveal posts & exhibitor cards

Scarab 5 — the year’s blade

SEKI calls 圣甲虫5 (Scarab 5) “three years grinding one sword” — its annual flagship, armour-breaking on arrival. The show offering is the final five allocation sets, assigned by on-site draw rather than queue.

The rest of the table

A special collab with NEK — 玄·甲虫, the dark beetle — plus an all-new white-copper 波 (Wave) and the 波帕 Wave-Pa. The studio (est. June 2022) works under one thesis: complexify EDC structure, keep the scene’s blood moving, and never let “cloud detox” replace holding the object.

5Scarab 5 sets · by draw
3years in development

More from the stand

Show piece, from the maker's announcement
Fig. 02 — Show piece, from the maker’s announcement
Show piece, from the maker's announcement
Fig. 03 — Show piece, from the maker’s announcement

Pocket Mechanica does not publish pricing. Written before the show opens; release behaviour will be recorded after 1–2 August.

Filed